Burlington Go Station


project gallery image
project gallery image

Job Name: Burlington Go Station

Contractor: Loc-Pave, Curbside Construction & OSM

Owner: Go Transit

Engineer/Architect: Go Transit

Background:

With creating an updated Go Station near Highway 407 and Dundas, Loc-Pave was required to make the space AODA compliant.

Product(s)/Solutions Provided:

Form & Build supplied Loc-Pave with ADA Cast In Place replaceable tiles, which allows for change of the tiles without having to remove the concrete around them. The tiles will get worn with time and need to eventually be replaced, the replaceable tile allows for this to be a quick and easy process. The site was poured by OSM and the tiles were installed by Curbside Construction.

Steve Kerr Memorial Complex


project gallery image
project gallery image
project gallery image

Job Name: Steve Kerr Memorial Complex

Contractor: Ball Construction

Owner: Municipality of North Perth

Engineer/Architect: BBA Architects - Whitby

Background:

Non-slip stairways were needed in the stands for the newly built Steve Kerr Memorial Complex.

Product(s)/Solutions Provided:

Both Access Tile & Anti Slip Traction Tape were chosen for these high traffic areas as they are able to withstand a lot of wear without degradation. The result is a very safe yet aesthetically pleasing environment.