Projects
Earl Turcotte Waste Transfer Facility
Effort Trust
Innovation Hub
Miller Peppel Stone Transfer Station Whitby
Press Pit
TTC McNicoll
Waterloo Memorial Recreation Complex
Garage Restoration – 50 Queen Street, Kitchener
Jacob’s Retirement Home Beamsville
Kiwanis Pool
Loblaws Restoration
MTO 2017-3029 – Scotland Drive Bridge Repairs
AVRIL Building
Bridge # 7 Rehabilitation
Caledonia Mill
Galt Wastewater Treatment Plant
Jacob’s Retirement Home Beamsville
NRC
Oxford County Sewage Pumping Station
Piller’s Brantford
Riverside Exhibition Centre
Galt Wastewater Treatment Plant
Nature Fresh
New Beverly Central Elementary School & COH Community Centre
Whitby Health Centre
Copper Road Salt Dome
Dundas Street Reconstruction
Garage Restoration – 50 Queen Street, Kitchener
Kettle Creek Public School
The Gaslight Condos
MTO 2017-3029 – Scotland Drive Bridge Repairs
Job Name: MTO 2017-3029 – Scotland Drive Bridge Repairs
Contractor: Mclean Taylor Construction
Owner: MTO
Engineer/Architect: N/A
Background:
Mclean Taylor Construction was required to strengthen and repair exisiting bridge piers on an MTO bridge project.
Product(s)/Solutions Provided:
Form & Build was able to supply MBrace Composite Strengthening System, a fiber reinforced polymer system, along with training on how to use it. MBrace is a perfect solution to upgrade load bearing capacities of concrete and masonry structures and restore capacity of concrete structure loss due to deterioration.