More Profiles
More Profiles
Nature Fresh Farms Phase 7
Press Pit
Oxford County Sewage Pumping Station
Fairway Road Expansion
TTC McNicoll Bus Garage
Earl Turcotte Waste Transfer Facility
Kettle Creek Public School
Riverside Exhibition Centre
Caledonia Mill
AVRIL Building
Kiwanis Pool
Steve Kerr Memorial Complex
Burlington Go Station
Loblaws Restoration
Peppel Stone Waste Transfer Facility
NRC
Jacobs Retirement Home
Scotland Drive Bridge Repair
New Beverly Central Elementary School and Community Centre
Insulfast Training
Waterloo Memorial Recreation Complex
The Gaslight Condos
Copper Road Salt Dome
SCM Construction - Planitop XS
Whitecrest Mushroom Farm
Job Profiles
JOB NAME: MTO 2017-3029 – Scotland Drive Bridge Repairs
CONTRACTOR: Mclean Taylor Construction
OWNER: MTO
ENGINEER/ARCHITECT: N/A
BACKGROUND:
Mclean Taylor Construction was required to strengthen and repair exisiting bridge piers on an MTO bridge project.
PRODUCT(S)/SOLUTIONS PROVIDED:
Form & Build was able to supply MBrace Composite Strengthening System, a fiber reinforced polymer system, along with training on how to use it. MBrace is a perfect solution to upgrade load bearing capacities of concrete and masonry structures and restore capacity of concrete structure loss due to deterioration.