Waterloo Memorial Recreation Complex
projects

Waterloo Memorial Recreation Complex

March 18, 2025

The City of Waterloo’s planned expansion of the Waterloo Memorial Recreation Complex broke ground in early 2020. However, construction was halted for a period of time due to the onset of the Coronavirus. When construction resumed, the General Contractor (GC) turned its attention to the pouring and waterproofing of the building’s elevator shaft. The original specification required a brush applied waterproofing membrane. The GC grew concerned that finding the manpower for this labour-intensive process would prove difficult during the pandemic and risk delaying the construction schedule.

Insulfast Training
projects

Insulfast Training

March 18, 2025

A London contractor was having an issue attaching 6” insulation to a parking structure wall. Previously, they were drilling and nailing the insulation panels in place. Securing the panels on a block wall is difficult as the block spalls around the nail leaving the insulation loose.

New Beverly Central Elementary School & COH Community Centre
projects

New Beverly Central Elementary School & COH Community Centre

March 18, 2025

This building is being built to consolidate both the Beverly Central Elementary and Dr. J. Seaton Senior Public Schools, as well as a 3,800 sqft new community centre.

MTO 2017-3029 – Scotland Drive Bridge Repairs
projects

MTO 2017-3029 – Scotland Drive Bridge Repairs

March 18, 2025

Mclean Taylor Construction was required to strengthen and repair exisiting bridge piers on an MTO bridge project.

Jacob’s Retirement Home Beamsville
projects

Jacob’s Retirement Home Beamsville

March 18, 2025

Bouwer Construction was working on the Jacob’s Retirement Home balconies which required coating, but due to the cold temperatures the spec’d product was flaking.

NRC
projects

NRC

March 18, 2025

For their New Build, the owner of the NRC building wanted their concrete walkways to match the colour of their precast panels. The original plan was to use white pigmented curing compound, however this wasn’t a permanent solution.

Miller Peppel Stone Transfer Station Whitby
projects

Miller Peppel Stone Transfer Station Whitby

March 18, 2025

After seeing huge success with the Earl Turcotte Waste Trasnfer Station, Miller is going to continue using Kryton Hardcem in all their transfer facilities.

Loblaws Restoration
projects

Loblaws Restoration

March 18, 2025

Historic Restoration was required to tear down, inventory and rebuild with all the same brick on their Loblaws Restoration project in Toronto. They also needed a tool that would help them easily and seamlessly install two truck loads worth of Cavityrock Insulation.

Burlington Go Station
projects

Burlington Go Station

March 18, 2025

With creating an updated Go Station near Highway 407 and Dundas, Loc-Pave was required to make the space AODA compliant.

Steve Kerr Memorial Complex
projects

Steve Kerr Memorial Complex

March 18, 2025

Non-slip stairways were needed in the stands for the newly built Steve Kerr Memorial Complex.

Kiwanis Pool
projects

Kiwanis Pool

March 18, 2025

After 50 years, the City of Kitchener needed to restore the Kiwanis Pool, in particular one expansion joint which was having greater than normal movement.

Earl Turcotte Waste Transfer Facility
projects

Earl Turcotte Waste Transfer Facility

March 18, 2025

Miller Waste was looking for new concrete flooring solutions for their transfer facilities; they needed something that would be resistant to surface abrasion and withstand the weight of dump trucks and other large vehicles for a long time. The Earl Turcotte Facility was designated as the test site to find the best solution.