All Products

Resources

About

What can we help you find?

All Products

All ProjectsInsulfast Training

Insulfast Training

March 18, 2025

Contractor:

N/A

Owner:

N/A

Engineer/Architect:

N/A

Project overview

Background

A London contractor was having an issue attaching 6” insulation to a parking structure wall. Previously, they were drilling and nailing the insulation panels in place. Securing the panels on a block wall is difficult as the block spalls around the nail leaving the insulation loose.

Solutions Provided