Project: St. Lawrence Seaway, Lock 4 & 5
Location: St. Catharines, Ontario
Contractor: Innovative Civil Constructors Inc.
Situation:
Solution: The above pictures demonstrate the building of cages built from Lag Stud and Reinforcing Steel. The workers then drill and dowel applying the S7 Adhesive. The purpose of forming these concrete panels in front of the existing concrete is to create a rail system. This rail system will prevent ships passing through the Locks from damaging the concrete.

The S7 Adhesive exceeded competitors’ products in the Pull Testing on Lag Stud and was deemed a superior product and the most cost efficient.